LPW Steelcraft was appointed to deliver the structural steel installation for an extension at the Froneri Ammonia Plant in Leeming Bar.
Working for main contractor Octane Construction Ltd, the project involved the erection of a 20-tonne structural steel frame alongside a 24-tonne mezzanine and external access stair core. Delivered as part of a full design and build package, the works required careful coordination and planning, particularly where installation conditions were restricted. Blind lifting operations were carried out to install the mezzanine roof deck and staircase within a confined rear access area.
Our client and main contractor for the project: Octane Construction
Location
Leeming Bar
Sector
Industrial
Scope
Structural Steel
Steel Weight
67 t